Case studies from contractors who rely on our fleet for commercial, civil and infrastructure projects.

CASE STUDIES

REAL PROJECTS.
REAL RESULTS.

From residential subdivisions to highway interchanges, IronClad machines have moved more than 14 million tonnes of material across Nevada since 2008.

High-rise building construction with tower crane
01
COMMERCIAL · 18 MONTHS

MERIDIAN TOWER, LAS VEGAS

40-storey mixed-use tower. 2 tower cranes, 4 excavators, 6 aerial lifts. Delivered on schedule despite a 3-week redesign mid-project.

Highway interchange construction
02
CIVIL · 11 MONTHS

I-15 INTERCHANGE EXPANSION

Major highway upgrade. 12 pieces of earthmoving equipment, 2 cranes, operating in 24-hour shifts over 340 days.

Residential subdivision construction site
03
RESIDENTIAL · 8 MONTHS

DESERT RIDGE SUBDIVISION

420-lot residential subdivision. Full land clearing, mass grading and utility trenching using 8 IronClad machines across 3 simultaneous crews.